WHRB heat-recovery calculation: gas duty, steam output and recovery boundaries

Engineering content contact: Engr. Muhammad Aalam
Manager Utilities, Ismail Resin · Industrial utilities engineer
Content updated

Independent engineering sign-off is not claimed. Editorial standards & corrections

Reconcile exhaust heat and steam duty with a worked WHRB balance, defined recovery boundaries and source-specific operating constraints.

Calculate, Understand & Investigate

In Calculators, choose “Waste heat recovery boiler”. Simple mode is free; Complex mode requires Professional access. Calculations support investigation, not equipment approval.

Photo, Video & Sound Analyzers →

A heat source is not the same as useful recovery

A waste heat recovery boiler transfers exhaust energy into water and steam. The upstream source sets exhaust flow and condition; the steam users determine whether recovered energy is useful. Lower steam production can follow lower source duty without any deterioration of the recovery boiler.

Separate gas sensible-heat reduction, steam-side transfer and actually delivered process heat. Calling all three efficiency hides losses, bypassing and unavailable demand. Supplementary firing introduces another input and must be counted separately.

Equations and declared variables

Gas duty Qg = mg × cp × (Tin − Tout), using gas mass flow mg in kg/s, mean heat capacity cp in kJ/(kg·K), gas temperatures in °C and Qg in kW. Steam-side duty Qs = ms × (hs − hf)/3,600, with steam flow ms in kg/h and enthalpies hs and hf in kJ/kg.

A descriptive transfer ratio is Qs/Qg × 100 when both duties share the same time period and boundary. It is not standard heat-exchanger effectiveness or total plant fuel efficiency. Blowdown, supplementary fuel, leakage and accumulation require additional terms in a full balance.

Worked balance (illustrative assumptions)

Assume exhaust 10 kg/s with mean cp 1.10 kJ/(kg·K), entering at 450°C and leaving at 250°C. Qg = 10 × 1.10 × 200 = 2,200 kW. Separately assume measured steam 2,800 kg/h with a 2,500 kJ/kg steam-to-feedwater enthalpy increase: Qs = 1,944.4 kW.

The descriptive ratio is 88.38%; the unreconciled difference is 255.6 kW. That difference is not automatically radiation loss: meter error, blowdown, gas-property assumptions and unmatched periods must be assessed. At ideal transfer of all 2,200 kW, equivalent steam would be 3,168 kg/h. Neither calculation selects a boiler or establishes permissible outlet temperature.

Thermal and source constraints

A mean cp is a screening approximation. For wider temperature/composition changes use gas enthalpy data or temperature-dependent properties. Pinch and approach constraints, bank arrangement, surface area and pressure levels limit achievable steam duty. The gas outlet cannot be selected from energy arithmetic alone.

Acid condensation and cold-end corrosion depend on gas composition, moisture, surface temperature and materials. The upstream source also has a permitted backpressure. Do not use a generic stack-temperature or pressure-loss target; obtain both boiler and source manufacturer limits.

Investigate reduced recovery with measurements

Compare source load, gas inlet/outlet readings, gas pressure drop, bypass position, feedwater enthalpy and steam output at equivalent conditions. A changed feedwater temperature changes the heat per kilogram of steam. Rising gas-side pressure loss and reduced matched-duty transfer justify qualified inspection but do not prove a particular deposit.

Document authorised cleaning or damper repairs and repeat the matched balance. Industry 4.0 trends should preserve sensor locations and timing. Do not claim recovered savings from heat that the site cannot use.

Safety and reference limits

Coordinate isolation of the upstream exhaust source, gas bypass, steam/water circuits and supplementary fuel where installed. Hot gas, pressure, toxic residues and confined spaces need approved procedures. Level trips and coordinated source protections must remain effective. This lesson is not an operating, light-off or cleaning procedure.

Technical References & Further Reading

Background sources, not endorsements or a claim of independent review. Use the applicable edition, installed manual and authorised site procedure for actual work.

This guidance is general. Always follow the equipment manufacturer's manual and your site safety procedures. See our engineering disclaimer.